- To: atlas@ucar.edu, cantrell@ucar.edu, ridley@ucar.edu, fried@ucar.edu, ffl@ucar.edu, wein@ucar.edu, mankin@ucar.edu, coffey@ucar.edu, shetter@ucar.edu, eisele@ucar.edu, mauldin@ucar.edu, zondlo@ucar.edu, kosciuch@ucar.edu, toohey@kelpie.colorado.edu, avallone@lasp.colorado.edu, rwt@hypatia.unh.edu, jack.dibb@unh.edu, eric.scheuer@unh.edu, gks@cisunix.unh.edu, zagar@notos.gso.uri.edu, e.v.browell@express.larc.nasa.gov, d.b.harper@larc.nasa.gov, l.a.heilman@larc.nasa.gov, w.b.grant@larc.nasa.gov, j.w.hair@larc.nasa.gov, c.f.butler@larc.nasa.gov, a.notari@larc.nasa.gov, r.j.deyoung@larc.nasa.gov, cohen@cchem.berkeley.edu, pfullmer@hydrogen.cchem.berkeley.edu, pjwool@socrates.berkeley.edu, joelt@socrates.berkeley.edu, rrosen@huarp.harvard.edu, dblake@orion.oac.uci.edu, rweber@eas.gatech.edu, jmerrill@boreas.gso.uri.edu, snow@gsosun1.gso.uri.edu, nblake@orion.oac.uci.edu, "Jennie L. Moody" <moody@virginia.edu>, pshepson@purdue.edu, djj@io.harvard.edu, Kenneth Pickering <pickerin@metosrv2.umd.edu>, Dale Allen <allen@metosrv2.umd.edu>, shaw.liu@eas.gatech.edu, Dpiyard@aol.com, dd16@acme.gatech.edu, (Gao Chen) gc37@prism.gatech.edu, Yuhang Wang <yuhang.wang@eas.gatech.edu>, brasseur@acd.ucar.edu, hess@ucar.edu, sasha@ucar.edu, emmons@ucar.edu, luca@acd.ucar.edu, dick@raf.atd.ucar.edu, jstith@raf.atd.ucar.edu, allen@raf.atd.ucar.edu, Bruce Morley <bruce@raf.atd.ucar.edu>, albright@ucar.edu, krista@raf.atd.ucar.edu, dtaylor@ucar.edu, lord@ucar.edu, lefer@ucar.edu, halls@ucar.edu
- Subject: TOPSE Schedule 1/13-1/14
- From: Lee Mauldin <mauldin@acd.ucar.edu>
- Date: Fri, 14 Jan 2000 16:14:53 -0700
Colleagues,
In case you haven't been informed, the engineering check flight scheduled
for today has been cancelled. There was a small plane that crashed next to
the NCAR/RAF taxiway Fri afternoon (1/13). As the area is now the site of
an accident investigation, the C-130 cannot taxi out until the
investigation is completed and the tape cording off the area removed. At
this point in time the flight is tentatively scheduled for 10:00am Sat
(1/14) pending on completion of the investigation.
The schedule for Sat Jan. 14 is aircraft power from 8-5 with an
interruption for the check flight at 10:00. If the check flight does not
go, power will be available with no interruption.
Have a nice weekend
Lee
Lee Mauldin (303) 497-1861 Voice
NCAR/ACD ML-186 (303) 497-1400 Fax
P.O. Box 3000
Boulder, CO 80307-3000
http://acd.ucar.edu/~mauldin/
Genious is the ability to see what's been out there all along waiting to be
seen.
P.T. Barnum aka: The Prince of Humbug